Testing virtual power plants' efficient provision of ancillary services from a communication system perspective

CyberNoc virtual power plant
August 29, 2018
Study finds that the OpenADR 2.0b communication architecture can fulfil functional requirements pertinent to flexibility-related data exchange.

Christoph Gutschi and Peter Nemcek co-authored in a scientific article about a German pilot project showcasing how Virtual Power Plants (VPPs) using OpenADR 2.0b can effectively provide ancillary services to the Transmission System Operator (TSO).

VPPs with their flexible aggregated assets offer a cost-efficient alternative to conventional power plants. To ensure their technical and economic feasibility, communication systems are of crucial importance.

In this context, CyberGrid experts Christoph Gutschi and Peter Nemcek joined forces with key industrial actors and conducted research and development to evaluate the OpenADR 2.0b communication protocol, comprising the public internet infrastructure to facilitate trading of distributed energy resources (DERs) as a flexible resource on the energy market. Data exchange based on the OpenADR 2.0b protocol between a CyberGrid VPP in Slovenia and a terminal management system in Germany over a period of several weeks confirmed OpenADR’s ability to communicate all kinds of messages essential for mFRR (“minute reserve”) to participate in the German market. Further, the tests assessed the selected quality of service parameters – required bandwidth, amount of traffic, message patterns, latency (round-trip time), packet loss and retransmissions.

In particular, the performance of the VPP communication system utilizing OpenADR 2.0b was tested in the scope of BESIC, a completed research project run by several partners including research institutions like HHLA AG, the largest German port operator at the HHLA Container Terminal. The project investigated the dynamic charging of battery stacks for automated guided vehicles (B-AGVs) used to transport containers between ships and storage areas at the port of Hamburg, Germany, from both environmental and economic perspectives.

VPP - Data exchange

In this study, the VPP collected electricity market data (e.g., accepted bids containing the clearing price and volume information) from an electricity market simulator using historic data from the German manual Frequency Restoration Reserve market (mFRR). It was demonstrated that the investigated OpenADR 2.0b communication architecture can fulfil functional requirements related to flexibility-related data exchange, when only minor adaptions are added to the protocol.

“OpenADR standards meet all the requirements for communications in European markets for electric energy and ancillary services. OpenADR has the potential to become the dominating protocol for power market communication in Europe in the near future’’, Christoph Gutschi states.

Internet communication protocol

The final version of the paper Virtual Power Plant Architecture Using OpenADR 2.0b for Dynamic Charging of Automated Guided Vehicles was accepted by the International Journal of Electrical Power & Energy Systems and is now available online.

Acknowledgements: The research and development project “Battery Electric Heavy Goods Vehicles in Intelligent Container Terminal Operations“ (BESIC) was funded by German Federal Ministry of Economics and Technology (BMWi), funding program “IKT für Elektromobilität II”. This work was supported in part by ARRS under the Scientific Program P2-0246.

Check event page

Other News:

CyberNoc Spot Guard managing PV, wind and battery output based on volatile spot electricity prices and negative price thresholds
News
April 23, 2026

Protect your PV investment against the negative prices with Spot Guard

Spot Guard helps energy assets respond to spot market volatility by adjusting generation or consumption when prices cross defined thresholds.

CyberGrid CFO Agent managing co-located energy flexibility
News
April 23, 2026

Turn Co-Located Energy Assets into One Profit Engine

CyberGrid joins the Austrian Sustainability Summit 2026 to showcase innovative storage solutions and strategies for a flexible, decarbonized energy future.

CyberGrid at the SmarterE 2026: VPP & Grid Insights
News
April 27, 2026

Operational Insights for Grid-Constrained Multi-Asset Sites

CyberGrid joins The smarter E Europe 2026 to share operational insights on managing grid-constrained multi-asset energy sites. Discover CyberNoc VPP and discuss scalable energy hub optimization.